Case Study:K.I.S.S (Keep It Simple, Sometimes)

September 14, 2016

Sometimes you want to take a break from pushing the technology and schedule envelope. An existing customer in the geothermal HVAC market had a field problem and needed the design and manufacture of a power supply module to solve a problem. Piece of cake, Summit accomplished the design for the customer as well as producing the prototype electronic controls for approval in a span of 60 days.